Foundry production scheduling with AI, described in words

Describe how your foundry really works, in words. FIP turns rules and constraints into a feasible production plan and tells you clearly what does not fit, and why.

In short

FIP schedules foundry production from moulding to pouring with an optimisation engine. Constraints are described in plain language: moulding capacity, stations, furnaces, kg per heat, alloys, shifts, shared patterns and limited flasks. The plan covers several weeks, includes late orders and always explains delays, unscheduled items and bottlenecks.

FIP production plan: daily moulded and poured quantities, late orders and bottlenecks
The plan with daily loads, orders at risk and bottlenecks. Illustrative screen with sample data.

Why foundry scheduling is different

In a foundry, capacity is not just hours of work. Moulding and pouring are linked, the furnace cannot pour below its minimum, alloys cannot be mixed in the same heat, patterns are shared between items and flasks are a limited resource that returns only after shakeout.

Generic scheduling tools struggle with these rules. FIP was designed around them.

Constraints you can describe in words

  • Moulding capacity: maximum flasks per day, number of stations, coupled moulding and pouring lines.
  • Furnaces: number, capacity, kg per heat, heats per day and minimum quantity per heat.
  • Alloys: no different alloys in the same heat.
  • Patterns as shared resources, also between different items.
  • Limited flasks, busy from moulding until shakeout or a set number of days after pouring.
  • Man time and machine time, crews and shifts (for example “line 6:00–19:00”).
  • Maximum time between phases, for example between moulding and pouring.

A plan that explains itself

A plan is useful only if you understand it. FIP always tells you what stays behind, what could not be scheduled and why, which resource is the bottleneck and how saturated it is. Orders already late are included in the plan from the first day.

Several weeks ahead

A plan over at least four weeks, then replanning on the week or the day.

Bottlenecks in plain sight

Saturation of moulding, furnaces and flasks, day by day.

What if…?

“What if we add a heat on Saturday?” FIP recalculates with the new rule.

Replanning by talking

When something changes, you do not need to reconfigure anything. Tell FIP: “furnace 2 is stopped on Tuesday”, “give priority to customer X”, “add a shift on the moulding line”. FIP creates a temporary plan with the new rules, compares it with the main one and shows you the difference.

The main rules of the foundry are described once, in words, and saved. Every planner can then work with the same rules.

Frequently asked questions

Do I have to enter the constraints in a configuration form?

No. The constraints are described in plain language, for example “the moulding line makes at most 180 flasks a day” or “furnace 1 pours at least 900 kg per heat”. FIP translates them into scheduling rules.

Does it work for any type of foundry?

It is designed to adapt to different foundries: manual or automatic moulding, one or more furnaces, ferrous and non-ferrous alloys. The rules describe your plant, not a standard model.

Does FIP replace the planner?

No. It gives the planner a feasible plan in minutes and explains the critical points. Decisions stay with people, who can change the rules and recalculate at any time.

Do you have a concrete problem in your foundry?

Tell us about it. We will solve it together with a pilot project on your data, with measurable goals.

Updated November 21, 2026